Welcome to our website!
  • Short Lead Time for Orange Garbage Bags - Draw-string Garbage Bag – LGLPAK

Short Lead Time for Orange Garbage Bags - Draw-string Garbage Bag – LGLPAK


Product Detail

FAQ

Product Tags

Related Video

Feedback (2)

In the past few years, our company absorbed and digested advanced technologies both at home and abroad. Meanwhile, our company staffs a team of experts devoted to the development of Green Garbage Bags, Pp Non Woven Bags, Disposable Plastic Cups With Lids And Straws, "Change for the better!" is our slogan, which means "A better world is before us, so let's enjoy it!" Change for the better! Are you ready?
Short Lead Time for Orange Garbage Bags - Draw-string Garbage Bag – LGLPAK Detail:

2
3
4
5
6
7
8
9
10
11
12
13
16
17
21
23

Product Feature

1.Designed to fit our trash cans perfectly

2.Extra strong and double thick seams

3.Strong drawstring handles

4.Convenient dispenser packs

Colors are available

24
25
26

Trade Terms

Price Base on material, size, thickness, printing and quantity
Payment Payment tern: L/C and 30% deposit by T/T 
Samples 1) Sample time: 3-7 days for non-printed bag; 7-15days for printed bag
2) Available to supply free samples of similar current size, If need as client’s required size, will charge US$ 200 per size.
Quality Control 1) Professional inspector and we have rich experience in arranging international inspection, such as BV, SGS and so on.
Shipping port Qingdao, Tianjin, Shanghai, Guangzhou or appointed port in China
Delivery Time It is based on the order details. Generally speaking, it takes 15-40days for one 20ft container after samples are approved.
Price Valid Time 7-15days or depends on the fluctuation of raw materials

1111
2222
33333

Service

1.To greatly enhance the quality of the products and reduce the production cost through technical innovation, process improvement, introduction of advanced equipment and technology and elimination of outdated technology and production line.

2.To reduce the cost of each process from production to the customer in the trade chain and thus provide customers with products with competitive price.

3.To save every penny for customers by promoting the standardization and normalization of production and trade management process while reducing the hidden costs caused by possible misunderstanding.


Product detail pictures:

Short Lead Time for Orange Garbage Bags - Draw-string Garbage Bag – LGLPAK detail pictures


Related Product Guide:

We have been ready to share our knowledge of internet marketing worldwide and recommend you suitable merchandise at most aggressive rates. So Profi Tools present you very best price of money and we are ready to develop alongside one another with Short Lead Time for Orange Garbage Bags - Draw-string Garbage Bag – LGLPAK, The product will supply to all over the world, such as: New Zealand, Turkey, Uganda, With the enterprising spirit of" high efficiency, convenience, practicality and innovation", and in line with such serving guidance of "good quality but better price, " and "global credit", we've been striving to cooperate with the automobile parts companies all over the world to make a win-win partnership.
  • It is not easy to find such a professional and responsible provider in today's time. Hope that we can maintain long-term cooperation.
    5 Stars By Aaron from Spain - 2017.05.02 18:28
    It is really lucky to meet such a good supplier, this is our most satisfied cooperation, I think we will work again!
    5 Stars By Judith from Slovenia - 2018.05.15 10:52
    Write your message here and send it to us